Topic

Project Management.

43 posts tagged Project Management, newest first.

All articles.

43 posts
A timeline of six points with the fourth point marked by a flag, standing for progress measured against an estimate on a fixed-fee project.
Articles

Revenue Recognition for Professional Services: Fixed-Fee Revenue Follows the Hours You Logged.

On fixed-fee projects, revenue often follows progress, and progress is measured in logged hours. Late time entries misstate revenue and margin together.

A row of four numbered nodes joined by arrows with the third node green and checked, and a card beneath.
Articles

Project Profitability Is Decided at the Estimate and the Time Code, Not the Invoice.

Project profitability is decided long before the invoice, in two places: how the estimate is structured and how time is coded. Use the same phases and role

Seven vertical bars of different heights with one green bar bracketed and a check badge above.
Articles

Billable Utilization: The Average Hides the Leak.

A single billable utilization figure averages away the leak. Split every hour into four buckets, billed, written down, not invoiced and non-billable by cho

Four small navy tiles stacked in a column beside one taller green outlined tile, joined by thin connectors, one connector broken with a small red gap.
Articles

Time Tracking for Consultants: The Entry That Decides Whether the Project Was Profitable.

A time entry carries five facts. Most firms capture three, and the missing two are the ones that join the hours to the proposal and the invoice.

A navy ledger of nine horizontal rows; the first six are shaded grey and the last three are outlined in green.
Articles

The Month-End Close for a Services Firm: Why It Takes Nine Days and What Makes It Three.

The close takes nine days, and the finance team is not slow. The first six are spent finding out what happened during the month, because nobody recorded.

Zoho Projects Is Not a PSA: The Four Things a Services Firm Bolts On Before It Can See Margin by Project.
Articles

Zoho Projects Is Not a PSA: The Four Things a Services Firm Bolts On Before It Can See Margin by Project.

Zoho Projects is a good project tool, and a services firm that buys it expecting to see margin by project will not, because four things it needs are.

What Breaks Between the Proposal, the Project and the Invoice.
Articles

Professional Services Automation: What Breaks Between the Proposal, the Project and the Invoice.

A services firm writes a proposal in one system, runs the project in a second and invoices from a third. Time is the unit in all three, and nothing.

Three columns of different heights standing on one baseline, each partly filled in purple, with a dashed green reference line above them that none of the columns reaches evenly.
Articles

The Utilization PSA Software Cannot See: Why a Services Firm Cannot Tell What Work Is Profitable.

Every services firm tracks utilization, and almost none can say which engagements made money. The number is not hidden. It is undefined, computed with three different denominators in three systems, with the unlogged work missing from all of them. Why PSA software automates the disagreement, and what to settle first.

Abstract editorial illustration of a software team structure: connected role nodes forming a small cross-functional unit, purple and magenta palette.
Articles

Software Development Team Structure: The Roles, Models, and Right Size.

How to structure a software development team: the essential roles, how they work together, generalist vs specialist and cross-functional models, and how big the team should be.

Photorealistic scene of a business team interviewing and evaluating a software development vendor across a conference table, slate and amber tones.
Articles

How to Choose a Software Development Company: A Buyer's Framework.

How to choose a software development company: the criteria that matter, the questions to ask, the red flags to avoid, and a step-by-step selection process.

Branded CodeStringers cover graphic reading 'Staff Augmentation vs. Project Outsourcing' over a dark indigo gradient.
Articles

Staff Augmentation vs. Project Outsourcing: Which Model Fits Your Build?

Staff augmentation vs project outsourcing, compared: who manages the work, who owns delivery risk, where each fits, the hybrid middle ground, and how to choose.

Abstract editorial illustration of software requirements gathering: soft blue gradients with connected nodes converging from many stakeholder inputs into a single structured document.
Articles

Requirements Gathering Techniques for Getting the Build Right.

How to gather software requirements before you build: the techniques that work, the deliverables you should walk away with, and the mistakes that quietly sink projects.

Where we're not the right answer

We'll tell you if we're a fit. If we're not, we'll tell you that too.

  • Your current stack works and nobody wants to change it
  • You want licences resold at a discount and nothing else
  • Your internal team owns the operating model and is not handing it over
  • You want hours of configuration work and nothing run for you: that is on our services pages, and it is not a managed solution
How we start

Most of our best clients come to us with a feeling, not a plan.

"Something isn't working." "We're outgrowing our tools." "We're afraid to make the wrong move." No-Risk Discovery is a short, practical conversation that gets you clarity before you commit to anything big. We'll tell you if we're a fit. If we're not, we'll tell you that too.